• Tech News
  • Fintech
  • Startup
  • Games
  • Ar & Vr
  • Reviews
  • How To
  • More
    • Mobile Tech
    • Pc & Laptop
    • Security
What's Hot

Oral-B iO10 Limited Edition electric toothbrush review: The last word in luxury – and price

January 29, 2026

9 Essential iPhone Accessibility Features to Use in 2026

January 29, 2026

Apple Watch SE 3 review: The easy choice

January 29, 2026
Facebook Twitter Instagram
  • Contact
  • Privacy Policy
  • Terms & Conditions
Facebook Twitter Instagram Pinterest VKontakte
Behind The ScreenBehind The Screen
  • Tech News
  • Fintech
  • Startup
  • Games
  • Ar & Vr
  • Reviews
  • How To
  • More
    • Mobile Tech
    • Pc & Laptop
    • Security
Behind The ScreenBehind The Screen
Home»Tech News»NASA delays Artemis I’s launch for a second time
Tech News

NASA delays Artemis I’s launch for a second time

September 3, 2022No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
NASA delays Artemis I’s launch for a second time
Share
Facebook Twitter LinkedIn Pinterest Email

NASA has as soon as once more scrubbed the launch of its House Launch System (or SLS) rocket after engineers failed to repair a persistent hydrogen leak.

The hydrogen leak was first observed this morning, quickly after the rocket started being fueled with liquid hydrogen. The staff made three troubleshooting makes an attempt, however a leak was detected after every effort to repair the issue. After the third time, engineers beneficial that the launch be a ‘no go’.

The SLS is supposed to be one of many workhorses of NASA’s Artemis program, and is tasked with launching the Orion crew capsule that can hopefully ferry astronauts to the moon.

The company additionally scrubbed the earlier launch try of the SLS, which was imagined to occur on August twenty ninth, citing points with the engine bleed system meant to assist the engines get to a correct temperature earlier than takeoff. A hydrogen leak was additionally detected throughout that launch try.

NASA has one other launch window left — from 5:12 PM to six:42 PM on September fifth — earlier than it faces a significant delay. The flight termination system that’s meant to maintain the rocket from changing into a harmful missile if one thing goes very fallacious throughout launch must be re-tested comparatively often (it’s imagined to be each 20 days, however NASA acquired that prolonged to 25 days), and that testing can’t be completed on the launch pad.

Provided that the rocket rolled out to the launchpad on August sixteenth, NASA’s time will just about be up after September fifth. If the SLS doesn’t launch then, it’ll need to be rolled again to NASA’s Automobile Meeting Constructing the place the termination system could be re-tested. That’ll take time, doubtlessly pushing this launch again to late October on the earliest.

See also  How To Optimize Your Team’s Time This Fall

If that launch is profitable although, it ought to pave the best way for a mission subsequent yr the place NASA sends a crew up within the Orion capsule for the primary time. They’ll simply be flying across the moon, not touchdown on it — that milestone is deliberate for 2025, once we’ll hopefully see the primary lady stroll on the moon.

Creating…

Further reporting by Mary Beth Griggs

Source link

Artemis delays launch NASA time
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Related Posts

Galaxy Tab A11+ review: What has Samsung been doing all this time?

December 24, 2025

Apple Music’s ‘All Time Replay’ Lets You Relive Your Top Hits of the Past Decade

June 30, 2025

Apple to Launch Apple Intelligence in China amid US Concerns

June 18, 2025

Five New Games Launch on Apple Arcade, Four More on the Way on July 3

June 6, 2025
Add A Comment

Comments are closed.

Editors Picks

Resident Evil Village DLC gameplay trailer show off controllable Lady Dimitrescu

July 22, 2022

Iris Software Group acquires myPay Solutions from Thomson Reuters

October 27, 2022

Apple Releases First iOS 17.2 Beta

October 26, 2023

a16z leads $6.5M seed round for Adaptive, a construction software and fintech play – Fintech

July 7, 2022

Subscribe to Updates

Get the latest news and Updates from Behind The Scene about Tech, Startup and more.

Top Post

Oral-B iO10 Limited Edition electric toothbrush review: The last word in luxury – and price

9 Essential iPhone Accessibility Features to Use in 2026

Apple Watch SE 3 review: The easy choice

Behind The Screen
Facebook Twitter Instagram Pinterest Vimeo YouTube
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 behindthescreen.fr - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.