• Tech News
  • Fintech
  • Startup
  • Games
  • Ar & Vr
  • Reviews
  • How To
  • More
    • Mobile Tech
    • Pc & Laptop
    • Security
What's Hot

Apple Will Make Joining Public Wi-Fi Networks Easier in iOS 26

July 3, 2025

Will the iPhone 17 Pro Max Finally Solve Battery Anxiety?

July 3, 2025

Apple Slows Down on ‘iPad Fold’

July 3, 2025
Facebook Twitter Instagram
  • Contact
  • Privacy Policy
  • Terms & Conditions
Facebook Twitter Instagram Pinterest VKontakte
Behind The ScreenBehind The Screen
  • Tech News
  • Fintech
  • Startup
  • Games
  • Ar & Vr
  • Reviews
  • How To
  • More
    • Mobile Tech
    • Pc & Laptop
    • Security
Behind The ScreenBehind The Screen
Home»Startup»Data Centers Are Facing a Climate Crisis
Startup

Data Centers Are Facing a Climate Crisis

August 1, 2022No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Data Centers Are Facing a Climate Crisis
Share
Facebook Twitter LinkedIn Pinterest Email

When document temperatures wracked the UK in late July, Google Cloud’s information facilities in London went offline for a day, as a consequence of cooling failures. The impression wasn’t restricted to these close to the middle: That specific location companies clients within the US and Pacific area, with outages limiting their entry to key Google companies for hours. Oracle’s cloud-based information heart within the capital was additionally struck down by the warmth, inflicting outages for US clients. Oracle blamed “unseasonal temperatures” for the blackout.

The UK Met Workplace, which displays the climate, means that the document warmth was an augur of issues to return, which suggests information facilities want to arrange for a brand new regular.

The World Meteorological Group (WMO) says there’s a 93 p.c likelihood that one yr between now and 2026 would be the hottest on document. Nor will that be a one-off. “For so long as we proceed to emit greenhouse gases, temperatures will proceed to rise,” says Petteri Taalas, WMO secretary normal. “And alongside that, our oceans will proceed to grow to be hotter and extra acidic, sea ice and glaciers will proceed to soften, sea stage will proceed to rise, and our climate will grow to be extra excessive.”

That climate shift will have an effect on all human-made infrastructure—together with the information facilities that maintain our planet’s collective information on-line.

The query is whether or not they’re ready. “From my viewpoint, there is a matter with current information heart inventory that’s been constructed within the UK and Europe,” says Simon Harris, head of important infrastructure at information heart consultancy Enterprise Vital Options. Nevertheless it doesn’t cease there. Forty-five p.c of US information facilities have skilled an excessive climate occasion that threatened their capability to function, in response to a survey by the Uptime Institute, a digital companies requirements company.

See also  3 Ways Companies Can Reduce Their Environmental Impact (Without Compromising On Efficiency)

Information heart cooling methods are constructed utilizing an advanced, multi-stage course of, says Sophia Flucker, director at UK information heart consulting agency Operational Intelligence. This may occasionally embrace analyzing temperature information from a climate station near the purpose the place the information heart shall be constructed.

The issue? That information is historic and represents a time when temperatures within the UK didn’t hit 40 levels Celsius. “We’re on the fringes of a altering local weather,” says Harris.

“It wasn’t that way back that we had been designing cooling methods for a peak out of doors temperature of 32 levels,” says Jon Healy, of the UK information heart consultancy Keysource. “They’re over 8 levels larger than they had been ever designed for.” The design circumstances are being more and more elevated—however information heart firms, and the purchasers they’re working for, function as profit-driven enterprises. Information from consultancy Turner & Townsend means that the price of constructing information facilities has risen in virtually each market in recent times, and building firms are suggested to maintain prices down.

“If we went from 32 levels to 42 levels, blimey,” says Healy. “You’re having to make every thing considerably bigger to assist that very small proportion of the yr” when temperatures rise. “It’s received to be completed with warning.”

Source link

centers climate crisis data facing
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Related Posts

Pickpocketed and Powerless? Tech Exec’s $5M Lawsuit Accuses Apple of Withholding iCloud Data

April 23, 2025

How to Recover Data from an External Hard Drive?

November 24, 2024

Enfabrica 3.2 Tbps ACF SuperNIC Chip: Boosting AI Data Center Performance And Reliability For Massive AI Cluster Scale

November 20, 2024

Top 10 Best Professional Data Recovery Software

May 27, 2024
Add A Comment

Comments are closed.

Editors Picks

HSBC debuts variable recurring payments for open banking customers

August 25, 2022

Withings ScanWatch Nova Brilliant review: Beauty and the heartbeat

April 18, 2025

The Myth Of $1 Million ARR In The Software Industry

December 11, 2022

‘Americans Are the Most Difficult to Manage’

February 28, 2023

Subscribe to Updates

Get the latest news and Updates from Behind The Scene about Tech, Startup and more.

Top Post

Apple Will Make Joining Public Wi-Fi Networks Easier in iOS 26

Will the iPhone 17 Pro Max Finally Solve Battery Anxiety?

Apple Slows Down on ‘iPad Fold’

Behind The Screen
Facebook Twitter Instagram Pinterest Vimeo YouTube
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2025 behindthescreen.fr - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.